Springvale Level Crossing Removal (2013 – 2014)

Springvale Level Crossing Removal (2013 – 2014)

Auscut was pleased to be part of the Springvale Level Crossing removal project. The project was designed to remove the level crossing at Springvale Road and move the train station underground. The works involved the removal of the level crossing, a new premium train station and improved bus, taxi, bicycle and pedestrian facilities.

As part of the project works, Auscut provided a range of services including drilling, hand sawing, ring sawing, road sawing and wall sawing over the course of the project. Our time on site needed to work in with project specifications, requiring works to be undertaken afterhours and during shutdown periods to ensure the job was finished on time.

Client:   McConnell Dowell Balfour Beatty Joint Venture